Thursday, December 5, 2019
Operating System
Question: Write a report about the operating system. Answer: The operating system chosen for the host server and why this one was chosen? Vsphere server 2012 is set for the powerful server virtualisation which helps in getting the best performance and the availability with proper efficiency of the infrastructure and the applications. The system of the Operations Management generally moves to the intelligent level which provides a better performance and the availability. This is able to handle the platform automation to hold the consistent management that maximise the benefits of the virtual data centre. The intelligent operations adapts for the specific environment which gives a better options for the handling of operations and safely automate the infrastructure management that guides towards the remediation as well as the customised actions. The cloud API integration with the robust security helps in protecting the data and applications with the more secured bare-metal server that will be able to handle the minimised errors with the streamlines routine tasks. The vsphere has been set for the higher availability which is set to assure about the virtualised IT environment without holding the costs or the complexity of the different clustering solutions. The virtualisation software chosen for this installation? The virtualization software used in this project is: VM ware. Provide full user documentation Considering the virtual switch setup, the network has been set to handle the IP setup with the proper DHCP configuration. This has been the best company which is able to provide the cloud and the virtualization software for the services. This has been properly acquired to run on the Microsoft Windows with the enterprise software hypervisors for the server. The VMWare is set for the asset optimisation which specialised in the capacity planning and the lab management. There have been products of VMWare which provides a complete virtualised software for handling the hardware, video adapter and the other hard disk adapters. There are USB, serial and the parallel devices for working on the high portable computers for the different operations. This allows the migration of the operational guests with the workstation transition. This used the CPU to run the codes on the user mode. The segmentation mechanism can protect and handle the slowdown over the native ranges. This is able to avoid the problem related to virtualisation on the x86 based platforms. This is mainly to deal with the instructions by running on the kernel-code in the user mode. The explanation is based on handling the instructions which read the machine state and do not cause the results of exception. VMWare is for providing a better functionality through the users who work on the virtual machines through the use of the reduced functionality features. Network Report A justification that the network created met the business specifications that were required? The VMWare has been able to set the enterprise level product which is able to deliver a proper and a great performance for the freeware VMware server. This runs on the public cloud platform with the virtual desktop infrastructure. This is based on the web based services to guide the users for the handling of expertise level of the installation and the configuration process. The application management is directed to predate the extensions to the x86 which does not need the enabled processors and work on the designing of the extensions which supports the older processors. The users of the CPU is to run the entire code with the user mode status and the virtual 8086 mode. The execution cannot be done directly. Any recommendations for future requirements? VMWare has been set for the optimisation and so it is important for the handling of the management and operations. The consistent management is able to provide the unified and the easy-to-use management to build in the vSphere. The intelligent operations offers the insights with the operations which directly adapts to the operational automation with the increased control. The intelligent workload balancing is through the visualisation capacity with the hold of clusters with the data centres. The workload capacity optimisation ensure the optimisation of the right sized based environment for handling the right sized based workload demands. The high availability delivers the vest for the virtualised IT environment without the costs or the traditional clustering of the solutions. The data protection delvers the storage efficiency with the backup through the patented variable length deduplication, rapid recovery and the WAN optimisation. The host profiles help in the platform automation w hich will handle the patch vsphere hosts in minutes. There is an update of the manager which reduce the time that has been spent on the remediation with the automation to track, patch and update the hosts. Lessons learnt post project that would change the way the project was implemented next time? The implementation and installation of the system on virtual machine has been very informative. We have learned after implementation that the server could have been installed by using the pre made copy of virtual machine. The VM has been installed on VMWare, but VirtualBox would have been a good candidate as well as a virtualization software. The implementation off various machines could have been done by directly copying the master virtual machine, instead of installing the same OS multiple times. Performance results on the functionality of the network? Recommended Space values for os/systems Win7 64 25GB Win7 64 25GB WinServ12 64 25GB WinServ12 64 25GB WinServ12 64 25GB WinServ12 64 50GB (Mail Server) IPCop 10GB Web Server 10GB VoIP 10GB Total WS Space: 50GB Total Services Space: 155GB Total Space (All): 205GB Current Layout Raid Machine -DC Primary -File Server -VoIP (Pending Investigation for External/Internal Specifications) -IPCop -IP Range192.168.0.0~254 Machine 1 -DC Secondary -Media Server -IP Range 192.168.1.0~254 Machine 2 -DMZ (Web Server) -Mail Server -IP Range 192.168.2.0~254 Wireless access point will be connected to the same switch as General Workstations. IP Range for workstations will be: 192.168.3.0~200 IP Range for Wireless will be: 192.168.3.200~254 Through the use of the above ranges, there have been access points to handle the machines that will be able to tract the web server along with the switch of the IP range. The DC secondary with the media server is able to handle the VoIP that directs for the pending investigation for the different internal and the external specifications. As per the recommendation, there have been space for the handling of the OS system which will help to take hold of the different VoIP services. VMWare is able to handle the services with the restructuring of activities of the different product lines. This is mainly associated to handle the business range that has a maintenance of the intervals. The computation is based on the users who could handle the different parts from the designing slides and compile the content to properly review the documents. The system is set for the user activity monitoring start up that incorporates for the vcloud networking. The system of the machine has been set in the w ay that the operations could be allowed to easily migrate the operational guests with the handling of hardware hosts through the use of same storage systems. Solutions or recommendations to performance issues? As per the results, there have been effective traffic input and the outputs which has a varying average speed on the particular day, in a month or the week. The average incoming traffic during the day time has been 2.691 kbps The average incoming traffic during the week has been 1.955 kbps The average incoming traffic during the month has been 429.084 bps. As per the results, there have been effective traffic input and the outputs which has a varying average speed on the particular day, in a month or the week. The average incoming traffic during the day time has been 2.691 kbps The average incoming traffic during the week has been 1.955 kbps The average incoming traffic during the month has been 429.084 bps. There have been operations that direct to handle the operations and the other configuration of the server to the switches. There is a need to handle the remote desktop for the DC server which is able to ensure the NICS working through the ping. The setup is done through the firewall or the router which handles the hypervisor. The configuration of the VPN system set is mainly to handle the checklists which work on the installation and the setup of the virtual machine GDvpSRV006. This is mainly to handle and configure the web server creation that directs to the installation as well as the setup of the system. Workforce Evaluation Report How you rate your own performance in the project? As per the work, the performance has been commendable as all the tasks have been performed in the way they were proposed. A proper installation of the server 2012 and working on the configuration of the Web server system is done as per the analysis on the checklist. There is a need to handle the setup of the virtual machine which directs to the download of all the exchange files as well as working over the system analysis. What tasks you performed for the team? The completed tasks described in detail? How you rate the teams performance? Every team member has been able to equally handle the problems and are able to work over it efficiently in time. The firewall configuration and the router configuration has been completed as per the instructions which direct to the test server and the other platform installation work. Your opinion on the issue of did everyone do an equal amount of work? Everyone worked on the issues equally and the team proved to be a helping hand for the completion of the project.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.